Jump to content

Joondalup line

From Wikipedia, the free encyclopedia

Joondalup line
A freeway with a railway in the median strip
Overview
Other name(s)Northern Suburbs Railway
OwnerPublic Transport Authority (2003–present)
LocalePerth, Western Australia
Termini
Continues asMandurah line
Stations13
Service
TypeSuburban rail
SystemTransperth
Operator(s)
Depot(s)
Rolling stock
Ridership14,045,991 (year to June 2023)
History
Commenced14 November 1989 (14 November 1989)
Opened20 December 1992 (20 December 1992)
Technical
Line length40.7 km (25.3 mi)
Number of tracks2
CharacterAt-grade and underground
Track gauge1,067 mm (3 ft 6 in) narrow gauge
Electrification25 kV 50 Hz AC from overhead catenary
Operating speed130 km/h (81 mph)
SignallingFixed block signalling
Train protection systemAutomatic train protection
Route map

Yanchep Bus transfer
Eglinton Bus transfer
Alkimos Bus transfer
opening 14 July 2024
Butler Bus transfer
Clarkson Bus transfer
Currambine
Joondalup Bus transfer
Edgewater
Whitfords Bus transfer
Greenwood
Warwick Bus transfer
Stirling Bus transfer
Glendalough Bus transfer
Leederville Bus transfer
Perth Underground Bus transfer Transwa
Elizabeth Quay Bus transfer
continues to Mandurah line Transperth

The Joondalup line is a suburban railway line and service in Perth, Western Australia, linking the city's central business district (CBD) with its northern suburbs. Operated by the Public Transport Authority as part of the Transperth system, the Joondalup line is 40.7 kilometres (25.3 mi) long and has thirteen stations. It commences in a tunnel under the Perth CBD as a through service with the Mandurah line. North from there, the Joondalup line enters the median strip of the Mitchell Freeway, where nine of the line's stations are. The line diverges from the freeway to serve the centre of Joondalup and permanently leaves the freeway north of Butler for the northernmost station of Butler.

Planning for a rapid transit service to the northern suburbs began in 1987. After several transport modes were considered, including bus rapid transit, an electric railway was chosen. Known during planning and construction as the Northern Suburbs Railway, the project was approved by cabinet in 1989 and construction began in November 1989. The Joondalup line was built under several different contracts, with the total cost of the original project being A$277 million. It used widely-spaced stations with bus interchanges and large park-and-rides, distinguishing the line from Perth's three existing rail lines. The Joondalup line opened on 20 December 1992 to limited service and with three stations: Leederville, Edgewater and Joondalup. Four more stations opened on 28 February 1993, and on 21 March 1993, peak service and feeder bus routes commenced. The final original station, Currambine, opened on 8 August 1993.

An extension north to Clarkson station and rebuild of Currambine station opened on 4 October 2004, which coincided with the introduction of B-series trains. On 29 January 2005, Greenwood opened as an infill station. The Joondalup line originally through-ran with the Armadale line via Perth station, but in 2005, the line started terminating at Perth station, and on 15 October 2007 the line was rerouted through a new tunnel under the CBD, with two new stations: Perth Underground and Elizabeth Quay. The Mandurah line opened on 23 December 2007 to connect with the southern end of that tunnel. An extension north to the current terminus of Butler station opened on 21 September 2014. A three station extension north to Yanchep is planned to open on 14 July 2024, upon which the Joondalup line will be renamed the Yanchep line.

B-series and C-series trains are the main rolling stock used on the Joondalup line. End-to-end services run at a fifteen minute headway, reducing to a ten minute headway in peak. Additional peak services run between Perth and Whitfords or Clarkson stations, making for a five minute headway on inner sections of the line. The Joondalup line received 14,045,991 boardings in the 2022–23 financial year, making it the second busiest line in the Transperth system, behind the Mandurah line.

History[edit]

Planning[edit]

The Northern Suburbs Rapid Transit Study was commissioned in 1987 by Transperth and the Department of Transport at the request of the Government of Western Australia. The study, published in September 1988 and written by a team of consultants, considered the mode of transport to use and the route to take.[1] Routes considered were along West Coast Highway, Marmion Avenue, the western side of the Mitchell Freeway, the median strip of the Mitchell Freeway, the eastern side of the Mitchell Freeway, Wanneroo Road, and Alexander Drive. The median strip of the Mitchell Freeway was determined to have the lowest cost and least environmental impact out of each of the routes.[2] Transport modes considered by the study were buses on a separate roadway, buses on a guided busway (like the O-Bahn Busway in Adelaide), light rail, heavy rail, automated rubber-tyred trains, high-capacity monorail, and an automated people mover system. A monorail or automated people mover were ruled out due to the cost and unproven nature of those technologies. Light rail was also ruled out due to having a lower operating speed than other modes and the desire to not introduce another mode to Perth's transport system. A bus expressway, guided busway and electric railway along the Mitchell Freeway were all shortlisted for further consideration.[2]

Public consultation found that 41.0 percent of people preferred an electric railway, 34.4 percent preferred a bus expressway, 19.3 percent preferred a guided busway, 3.2 percent did not want any rapid transit, and 2.2 percent preferred some other option. The people who preferred rail chose it because of its greater comfort, lower pollution and less crowding. The people who preferred the bus options chose them because there would be no transfer for trips into the Perth central business district (CBD) and the bus options would cost less than a railway.[3] The study suggested that the bus options could be built in multiple stages and the rail option could first be built between Perth and Warwick and later be extended to Joondalup.[4] The two bus options were projected to increase northern suburbs public transport patronage by fourteen percent and the rail option was projected to increase patronage by nine to twelve percent, which was less than the bus options because of the time taken to transfer from bus to train.[5] The net cost of the railway was estimated to be $145 million, compared to $87 million for the guided busway and $79 million for the bus expressway.[6] The Northern Suburbs Rapid Transit Study concluded that either of the bus options were preferred over the electrified railway, and that further studies should determine whether to build a bus expressway or a guided busway.[7]

In response to the Northern Suburbs Rapid Transit Study, the state minister for transport, Bob Pearce, set up an expert panel consisting of Murdoch University Associate Professor Peter Newman, Tyne and Wear Transport Director General David F. Howard, and University of Pennsylvania Professor Vukan Vuchic.[8] The expert panel concluded that an electrified railway would be the best option instead of a bus rapid transit system.[9] They costed an electric railway at $124 million and gave a lower operating cost for the railway compared to the bus options, making up the difference in cost within 12 to 15 years.[10] The expert panel criticised the Northern Suburbs Rapid Transit Study for concentrating on commuters travelling to the CBD and said that the bus system it recommended would not serve people doing short or local trips well.[11] The panel said that other cities show that a rail trunk line with feeder buses would attract more passengers.[12]

The Northern Suburbs Transit System Master Plan was released in November 1989. It laid out the route of the Northern Suburbs Railway and works proposed to occur. The railway was to be 29 kilometres (18 mi) long and have seven new stations: Glendalough, Warwick, Whitfords, Edgewater, Joondalup, and Burns (later renamed Currambine). It also gave the option of building stations at Oxford Street in Leederville, Wishhart Street between Stirling and Warwick, or Hepburn Avenue between Warwick and Whitfords.[13] The railway's planned route was mostly along the median strip of the Mitchell Freeway, deviating in the Perth central business district (CBD) to reach Perth station and in Joondalup to service the future city centre of Joondalup. A section between Joondalup and Burns was to be west of the future freeway, which at the time only reached as far north as Ocean Reef Road. The section through Joondalup was to be in a trench below surface level to allow for roads to bridge across.[14] The railway was to be fully grade separated with no level crossings, unlike Perth's existing rail network.[15]

The decision to locate the Northern Suburbs Railway in the Mitchell Freeway's median strip was made to reduce costs as the freeway was already grade separated from other roads and had its own right-of-way. The disadvantage of freeway-running railways is that access to the stations is more difficult, with walking distance in earlier plans from a bus interchange to the platform being between 70 metres (230 ft) and 180 metres (590 ft), and even longer for park-and-ride passengers. Earlier plans also had limited shelter and facilities at each station.[16] This was deemed bad for patronage, so the master plan instead located bus interchanges closer to the station platform. In the cases of Stirling, Warwick and Whitfords stations, the bus interchanges are on a bridge directly above the train platforms.[17] The feeder buses were planned to run between pairs of adjoining stations at a 10 to 15 minute headway in peak, covering the area between Wanneroo Road and the coastline. According to forecasts, two thirds of Northern Suburbs Railway passengers would use the feeder buses and 120 buses would be required. The opening of the railway would allow for express buses along the Mitchell Freeway to be phased out.[18]

Much of the Mitchell Freeway was designed with provisions for a public transport corridor in its median strip, however, the section between Loftus Street in Leederville and McDonald Street in Osborne Park, which was just a single carriageway with a dividing barrier, was not. On that section, a second carriageway, which now carries the freeway's northbound lanes, was planned to be constructed. Additional bridges would be built across Vincent Street, Powis Street, and Scarborough Beach Road for the new carriageway and the railway. Twelve other road bridges and nine pedestrian bridges needed minor modifications so that there was enough clearance for the overhead wires, and four bridges over the railway in Joondalup needed to be constructed.[19][20] The master plan said that alterations to Perth station were required. This included a new platform at the station's northern side, a new concourse west of the Horseshoe Bridge, and an extra span on the Barrack Street bridge.[21] New stowage tracks at Claisebrook depot would be required, and trains would also be stored at Whitfords station temporarily and at Currambine station.[15]

Cost of the Northern Suburbs Railway
Time Original cost 2022 cost
1988 estimate $150 million $384 million
1989 estimate $222.8 million $530 million
1993 final cost $277 million $579 million

The total cost of the Northern Suburbs Railway was estimated to be $222.8 million (equivalent to $530 million in 2022), of which $133.17 million was for the railway's construction and $89.63 million was for the acquisition of 22 two-car electric multiple unit trains. An additional $27 million for the works to widen the Mitchell Freeway between Leederville and Osborne Park was funded separately.[22] The $222.2 million was higher than the $150 million estimated in 1988 due to an underestimation in the cost of some parts of the project, increased facilities at stations, more bridges, the extension to Currambine which was not accounted for, additional railcars due to higher forecasted demand, and inflation.[23] The railway was planned to opened between Perth and Joondalup by the end of 1992 and from Joondalup to Currambine by the end of 1993.[24]

Construction[edit]

In 1989, the state government confirmed it planned to build the Northern Suburbs Railway. On 14 November 1989, Premier Peter Dowding hammered in the first spike, marking the beginning of construction.[25] That year, the Parliament of Western Australia passed an enabling act authorising the construction of the railway, and on 15 January 1990, the act received royal assent.[26][27]

The 130-metre-long (430 ft) tunnel under Roe Street for the railway to enter the Mitchell Freeway was constructed using the cut-and-cover method. The walls of the tunnel was built by Remm Construction and the excavation, floor and roof was done by Leighton Contractors. The tunnel was constructed throughout 1991 and was planned to cost $8 million.[28] The road and rail bridges across Vincent Street, Powis Street, and Scarborough Beach Road were built by Leighton Contractors for $8.8 million. Work started on those bridges in April 1991. The bridges were incrementally launched to avoid disruption to road traffic.[29] The Fitzgerald Street level crossing, used by buses to access the Wellington Street bus station, was relocated 250 metres (820 ft) west to avoid intersecting with the Northern Suburbs Railway.[30] The master plan called for the level crossing to be replaced by a bridge instead,[31] but parliament passed legislation in late 1991 to prevent the bridge from being built.[32] The legislation was introduced to parliament by the independent member for Perth, Ian Alexander, and was supported by the Liberal Party and the independent member for Morley, Frank Donovan.[33] A nearby bridge next to the Mitchell Freeway ended being built and opened in 2010 as part of the construction of Perth Arena.[34]

Installation of the masts for the overhead line equipment was underway by April 1992. The masts were built by Delta Corporation and installed by Barclay Mowlem[35] as an extension to their contract for the electrification of the existing rail network.[36] By July 1992, tracklaying was underway.[37] In November 1992, a $1.2 million contract was awarded to TG Industries to supply a galvanised steel barrier between the railway and the Mitchell Freeway.[38] The original master plan only called for crash barriers at stations, where the tracks are below freeway level, and a few other circumstances.[39] A $2.8 million contract for the construction of Currambine station was awarded to Doubikin Constructions in November 1992 as well.[38] The overhead line equipment was energised for the first time on 1 November 1992.[40] On 20 November 1992, the first A-series train ran on the railway, and on 7 December 1992, driver route training commenced.[41]

A metal plaque on a wall
Plaque commemorating the opening of the Joondalup line on 20 December 1992 at Perth station

The first stage of the Joondalup line was officially opened on 20 December 1992 by Premier Carmen Lawrence and Transport Minister Pam Beggs. This involved the opening of Leederville, Edgewater and Joondalup stations. The West Australian newspaper reported that hundreds of people attended the opening of Leederville and Edgewater stations, and thousands of people attended the opening of Joondalup station, but that the state opposition criticised the opening ceremonies by saying that they were an "expensive political extravaganza". From 21 December, train services ran under a limited service "discoveride" brand, meaning that train services had a limited frequency of every half-an-hour and only operated between 9:30 am and 2:30 pm.[42][43][44]

Glendalough, Stirling, Warwick and Whitfords stations opened on 28 February 1993,[45] and on 21 March 1993, full service on the line between Perth and Joondalup commenced. This included trains in peak hour for the first time and feeder buses servicing the Joondalup line's bus interchanges.[46][47] Bus routes which ran directly to the CBD were withdrawn.[47][48] New Coalition Transport Minister Eric Charlton held a small opening ceremony at Joondalup station for the start of full service, in contrast to the large opening ceremony conducted by the Labor government in December 1992.[46][47] He also highlighted the increased operating costs that the new line would have, which was used as a justification for a fare increase.[47][49] On 8 August 1993, the extension to Currambine station opened, marking the completion of the Joondalup line for the time being. The final cost was $277 million.[50][51]

Expansion under New MetroRail[edit]

Brick platform with large metal shelter and a train stopped to the left
Clarkson station, which opened on 4 October 2004
Station platforms with shelter covering the platforms and tracks and stairs heading up to a footbridge
Greenwood station, which opened on 29 January 2005

The first contract for the Clarkson extension was awarded in March 2001, when Brierty Contractors signed a $14 million earthworks contract.[52] Work began in May 2001[53] and was completed in November 2002.[54] In July 2001, the contract for the construction of the rail bridge over Burns Beach Road was awarded to Transfield Pty Ltd for $1.7 million.[52][55] The Burns Beach Road bridge was completed in May 2003.[56] In April 2002, Barclay Mowlem and Alstom were awarded a contract worth $17 million for the rail infrastructure for the extension.[52] This contract included the design and construction of the track, traction power, signalling and communications systems, as well as track relocation at Greenwood station.[57] The $3.2 million contract for the construction of Currambine station was awarded to John Holland Group in March 2002.[52] In November 2002, an $8.7 million contract was awarded to Transfield for the construction of Clarkson station.[58] In February 2004, a $6.8 million contract to build Greenwood station was awarded to John Holland Group.[59][60] Construction of the station began in March 2004.[61][62]

Nowergup depot, which cost $36 million, officially opened in June 2004.[63] The extension to Clarkson and new Currambine station opened on 4 October 2004, the same day on which the first five Transperth B-series trains entered service on the Joondalup line.[64][65][66] On 29 January 2005, Greenwood station was opened by Premier Geoff Gallop and the minister for planning and infrastructure, Alannah MacTiernan.[67]

The contract for the City Project was awarded to LeightonKumagai Gumi in February 2004 for $324.5 million.[68] The City Project reached practical completion in September 2007.[69] From 7 October to 14 October 2007, the Joondalup and Fremantle lines were shut down to connect the tunnel tracks to the Joondalup line,[70] and on 15 October 2007, the Joondalup line reopened with its new terminus at Esplaande station.[71][72] The Mandurah line opened on 23 December 2007.[70][73]

Extension to Butler[edit]

Drone view of a railway station
Butler station in February 2023

The first train ran on the Butler extension on 25 August 2014,[25] with train driver familiarisation beginning after that.[74] The extension was opened on 21 September 2014 by Premier Colin Barnett and Minister for Transport Dean Nalder, several months early and $20 million under budget.[75][76][77]

Extension to Yanchep[edit]

Labor promised ahead of the 2017 state election that it would build the Yanchep Rail Extension as part of its revised Metronet plans. It was promised that the extension would open in 2021 and cost $386 million.[78] The September 2017 state budget gave the Yanchep Rail Extension a cost of $520.2 million.[79][80][81] The business case for the Yanchep Rail Extension was submitted to Infrastructure Australia in August 2017.[82] In November 2018, Infrastructure Australia released its assessment of the project, adding the project to the Infrastructure Priority List as a "High Priority Project" and giving it a projected economic benefit of $2.549 billion and a benefit–cost ratio of 2.6. Infrastructure Australia recommended that the contract for the Thornlie–Cockburn Link be combined with the contract for the Yanchep Rail Extension to save costs during procurement.[83][84][85] The Infrastructure Australia assessment allowed $700 million in federal funding to be spent on the Yanchep Rail Extension and the Thornlie–Cockburn Link, of which $350 million was for the Yanchep Rail Extension.[86][87]

Enabling legislation was introduced to the Parliament of Western Australia in May 2018[88][89] and passed in November 2018.[90] The project definition plan, detailing the scope of the project, for the Yanchep Rail Extension was approved by state cabinet in July 2018.[91] A request for proposal was released in September 2018 for the design and construct contract for the Yanchep Rail Extension and the Thornlie–Cockburn Link.[92][93] Two consortia were shortlisted in April 2019: METROconnex, a joint venture between Coleman Rail, Clough Group, and Georgiou Group; and NEWest Alliance, a joint venture between CPB Contractors and Downer.[94][95][96] In November 2019, NEWest Alliance was announced as the preferred proponent to design and build the Yanchep Rail Extension and the Thornlie–Cockburn Link.[97][98][99] The following month, the contract was signed.[100][101][102] The cost of the Yanchep Rail Extension at the time was $531.7 million.[103]

A drone shot of a sandy construction site
Howden Road bridge under construction in August 2023
A drone shot of a sandy construction site
Alkimos station under construction in August 2023

Early works began in November 2019 and a sod turning ceremony took place on 24 November, making the Yanchep Rail Extension the second Metronet project to begin construction, after the Forrestfield–Airport Link.[103] Major works on the Yanchep Rail Extension began in mid-2020.[104] Construction at Alkimos station had begun by March 2021, with the first major concrete pour taking place that month.[105]

In June 2021, PerthNow reported that work on the Yanchep Rail Extension had stalled, but the PTA was still saying the extension would open in late 2022.[106] The government first raised the potential for a delay in July 2021,[107] and after the September 2021 state budget, it was revealed that the Yanchep Rail Extension's opening date would be delayed by a year to late 2023 due to a skills shortage and to ease pressure on Western Australia's construction industry.[108][109][110] To cut costs, the construction of a shared path along the extension was cancelled, with the decision being justified by there also being a shared path along Marmion Avenue and a proposed one to be constructed as part of the extension of the Mitchell Freeway. The decision to cancel the shared path was criticised by cycling groups and the City of Wanneroo.[111][112][113] By the end of 2021, work on all three stations was underway. At Eglinton and Yanchep stations, the foundations were being poured, and at Alkimos station, retaining walls had been put up.[114][115]

The May 2022 state budget revealed a $175.3 million cost increase,[116] the May 2023 state budget revealed a $375.3 million cost increase,[117][118][119] and the May 2024 state budget revealed a $288 million cost increase,[120][121] bringing the extension's total cost to $1.27 billion.[122] The March 2022 federal budget revealed the federal government would provide $90 million of additional funding for the project, bringing its share of the project to $440 million.[123][124] After the May 2023 budget, the government said that the Yanchep extension "is due for completion at the end of 2023, with services commencing in the new year"[125] That month, the first 2.7 kilometres (1.7 mi) of track had been laid.[126][127] The first train ran on the Yanchep Rail Extension on 22 December 2023.[128][129] Passenger services are scheduled to commence on 14 July 2024, upon which, the Joondalup line will be renamed the Yanchep line.[130][131]

Future[edit]

There are provisions for a special events station to serve Arena Joondalup.[132][133]

Description[edit]

The Joondalup line was built with 1,067 mm (3 ft 6 in) narrow gauge track.[15] Trains are powered by 25 kV 50 Hz AC overhead line equipment[134] powered by three substations at Sutherland Street in West Perth, Edgewater, and Nowergup.[135]: 121–122  The maximum speed south of Currambine is 110 kilometres per hour (68 mph) and north of Currambine is 130 kilometres per hour (81 mph).[135]: 17–33  The line has used automatic train protection since it opened and is signalled to allow for headways as low as three minutes using fixed block signalling.[15] As part of the High Capacity Signalling Project, the signalling system will be replaced by a moving block system using communications-based train control (CBTC), allowing for higher frequencies.[136][137] As of 2021, the CBTC system is planned to be implemented on the Joondalup and Mandurah lines by June 2029.[138]

Route[edit]

Map
Transperth system map, with the Joondalup line in green, and the Yanchep extension in grey

Stations[edit]

Underground station concourse, with lifts and escalators down to platform level
Perth Underground station
Island railway platform with escalators going down and a metal shelter and glass side walls
Glendalough station
Large concrete structure with buses over island platform
Whitfords station

The Joondalup line spans five fare zones.[139] All stations on the Joondalup line are fully accessible except for Leederville, Stirling, and Edgewater stations, which have platform gaps that are too large. Leederville station also has a ramp that is too steep.[140] All platforms are approximately 150 metres (490 ft) long, allowing six-car trains to stop at all platforms.

Key
Icon Purpose
Under construction
Station Distance from Perth[141] Fare zone[142] Location Opened Connections[142][139]
km mi
Elizabeth Quay -0.6 -0.4 1/FTZ Perth 15 October 2007[72] Bus at Elizabeth Quay Bus Station
Services continue on the Mandurah line
Perth Underground 0.0 0.0 1/FTZ Perth 15 October 2007[72] Bus at Perth Busport
Australind, Airport, Armadale, Fremantle, Midland and Thornlie lines
Leederville 2.4 1.5 1 Leederville, West Leederville 20 December 1992[42] Bus
Glendalough 5.6 3.5 1 Glendalough, Osborne Park, Mount Hawthorn 28 February 1993[45] Bus
Stirling 8.8 5.5 2 Innaloo, Osborne Park, Stirling 28 February 1993[45] Bus
Warwick 14.5 9.0 2 Carine, Duncraig, Hamersley, Warwick 28 February 1993[45] Bus
Greenwood 17.7 11.0 2 Duncraig, Greenwood, Kingsley, Padbury 29 January 2005[67]
Whitfords 19.8 12.3 3 Craigie, Kingsley, Padbury, Woodvale 28 February 1993[45] Bus
Edgewater 22.9 14.2 3 Edgewater, Heathridge 20 December 1992[42]
Joondalup 26.2 16.3 3 Joondalup 20 December 1992[42] Bus
Currambine 29.2 18.1 4 Currambine, Joondalup 8 August 1993[51]
Clarkson 33.2 20.6 4 Clarkson 4 October 2004[66] Bus
Butler 40.7 25.3 5 Butler 21 September 2014[75] Bus
Alkimos 43.0 26.7 5 Alkimos 14 July 2024[131] Bus
Eglinton 46.7 29.0 5 Eglinton 14 July 2024[131] Bus
Yanchep 54.5 33.9 6 Yanchep 14 July 2024[131] Bus

Service[edit]

Joondalup line train headways reach as low as five minutes during peak, increasing to fifteen minutes outside peak and on weekends, and half-an-hour to an hour at night. During peak, some services terminate at or commence from Whitfords or Clarkson stations. Travel time from Butler to Perth Underground is 42 minutes. Trains commence at around 4:30 am to 5:30 am and end at around 1 am to 2 am, with later trains on weekends.[139]

Rolling stock[edit]

Electric passenger train viewed from bridge
Transperth B-series train south of Butler station

Transperth B-series trains and C-series trains run on the Joondalup line. The B-series trains are three cars long each, and are typically coupled together to form six car sets. These trains have a maximum speed of 130 kilometres per hour (81 mph), and have two doors on each side per car.[143] The C-series trains are six cars long, have a maximum speed of 130 kilometres per hour (81 mph), and have three doors on each side per car, which help reduce dwell times at stations compared to the B-series, making 18 trains per hour possible.[144] Previously, there were Transperth A-series trains operating on the line. These trains are two cars long, typically coupled together to form four car sets, have a maximum speed of 110 kilometres per hour (68 mph), and have two doors on each side per car. As more B-series trains were delivered, A-series trains were moved from the Joondalup and Mandurah lines to the other lines on the network.[145] The C-series trains entered service on 8 April 2024.[146][147] The B-series trains will be gradually transferred onto the other lines to replace A-series trains.[144][148] By about 2031, all trains on the Joondalup line will be C-series trains.[138]: 79 

In May 2002, the government signed a contract with EDI RailBombardier Transportation for the delivery and maintenance of 31 three car B-series trains, and the construction of the Nowergup depot.[143] In December 2006, the government signed another contract for 15 more three car B-series trains.[149][150] The first of these additional railcars were delivered in 2009, allowing several A-series trains to be moved from the Joondalup and Mandurah lines to other lines on the network, and for frequencies to increase on most lines, including the Joondalup line.[145] In July 2011,[151] the government ordered 15 more three car B-series trains.[152][153] In August 2012, this order was increased by two, to cater for the opening of Aubin Grove station on the Mandurah line. In November 2012, this order was increased by five, bringing the total order to 22 three car trains.[151][154] By the final delivery from that order, all trains operating on the Joondalup and Mandurah lines were B-series trains.[154] In December 2019, the government signed a contract with Alstom for the construction of 41 six car C-series trains.[155] These trains are expected to enter service on 8 April 2024.[146][147]

Most trains on the Joondalup line are stored and cleaned at Nowergup depot. There is also Mandurah depot on the southern end of the Mandurah line, which can store and clean a smaller number of trains. Maintenance occurs at Nowergup depot.[citation needed]

Patronage[edit]

By the Joondalup line's 30th anniversary on 20 December 2022, over 381 million trips had been made on the Joondalup line.[156]

Joondalup[157] line annual patronage
Year Patronage ±%
2010–11 15,611,836
2011–12 16,700,234 +6.97%
2012–13 17,449,891 +4.49%
2013–14 16,897,361 −3.17%
2014–15 17,105,797 +1.23%
2015–16 16,917,029 −1.10%
2016–17 16,658,559 −1.53%
2017–18 16,477,387 −1.09%
2018–19 16,531,788 +0.33%
2019–20 13,374,710 −19.10%
2020–21 11,885,779 −11.13%
2021–22 11,752,572 −1.12%
2022–23 14,045,991 +19.51%

References[edit]

  1. ^ Summary of the Northern Suburbs Rapid Transit Study 1988, p. 2.
  2. ^ a b Summary of the Northern Suburbs Rapid Transit Study 1988, p. 4.
  3. ^ Summary of the Northern Suburbs Rapid Transit Study 1988, p. 5.
  4. ^ Summary of the Northern Suburbs Rapid Transit Study 1988, p. 6.
  5. ^ Summary of the Northern Suburbs Rapid Transit Study 1988, p. 7.
  6. ^ Summary of the Northern Suburbs Rapid Transit Study 1988, p. 9.
  7. ^ Summary of the Northern Suburbs Rapid Transit Study 1988, p. 11.
  8. ^ Newman, Howard & Vuchic 1988, Front cover, p. 1.
  9. ^ Newman, Howard & Vuchic 1988, p. 1.
  10. ^ Newman, Howard & Vuchic 1988, p. 3.
  11. ^ Newman, Howard & Vuchic 1988, p. 11.
  12. ^ Newman, Howard & Vuchic 1988, p. 12.
  13. ^ Northern Suburbs Transit System Master Plan 1989b, p. 4.
  14. ^ Northern Suburbs Transit System Master Plan 1989b, p. 2.
  15. ^ a b c d Northern Suburbs Transit System Master Plan 1989b, p. 11.
  16. ^ Northern Suburbs Transit System Master Plan 1989b, p. 19.
  17. ^ Northern Suburbs Transit System Master Plan 1989b, p. 21.
  18. ^ Northern Suburbs Transit System Master Plan 1989b, p. 7.
  19. ^ Northern Suburbs Transit System Master Plan 1989b, p. 18; Northern Suburbs Transit System Progress Summary 1991, p. 6.
  20. ^ Edmonds, Leigh (1997). The Vital Link: A History of Main Roads Western Australia 1926–1996. University of Western Australia Press. p. 395. ISBN 978-1-876268-06-0.
  21. ^ Northern Suburbs Transit System Master Plan 1989b, p. 6–7.
  22. ^ Northern Suburbs Transit System Master Plan 1989b, p. 25, 28.
  23. ^ Northern Suburbs Transit System Master Plan 1989b, p. 1, 31.
  24. ^ Northern Suburbs Transit System Master Plan 1989b, p. 26.
  25. ^ a b "Our history". Public Transport Authority. Retrieved 17 May 2024.
  26. ^ "Perth-Joondalup Railway Act 1989". Parliamentary Counsel's Office. Department of Justice. Retrieved 4 January 2024.
  27. ^ "Perth-Joondalup Railway Act" (PDF). Parliamentary Counsel's Office. Department of Justice. Retrieved 4 January 2024.
  28. ^ Northern Suburbs Transit System Progress Summary 1991, p. 14.
  29. ^ Northern Suburbs Transit System Progress Summary 1991, p. 15–16.
  30. ^ "Fitzgerald St railway crossing to be moved". Media Statements. 15 October 1992. Retrieved 5 January 2024.
  31. ^ Northern Suburbs Transit System Master Plan 1989b, p. 18.
  32. ^ "Fitzgerald Street Bus Bridge Act 1991" (PDF). Parliament of Western Australia. Retrieved 17 May 2024.
  33. ^ "Extract from Hansard [ASSEMBLY — Tuesday, 19 August 2014]" (PDF). Parliament of Western Australia. Retrieved 17 May 2024.
  34. ^ "Bus bridge set to ease congestion". WAtoday. 31 July 2010. Retrieved 17 May 2024.
  35. ^ "Work underway on masts for northern suburban transit system". Media Statements. 22 April 1992. Retrieved 4 January 2024.
  36. ^ Northern Suburbs Transit System Progress Summary 1991, p. 9.
  37. ^ "Progress on Northern Suburbs Rapid Transit System (A/Min)". Media Statements. 13 July 1992. Retrieved 4 January 2024.
  38. ^ a b "Guard rail barrier between freeway and northern subs railway line". Media Statements. 10 November 1992. Retrieved 4 January 2024.
  39. ^ Northern Suburbs Transit System Master Plan 1989b, p. 17.
  40. ^ "Power for northern suburbs rail system to be switched on November 1". Media Statements. 8 September 1992. Retrieved 4 January 2024.
  41. ^ "Trial of first northern suburbs electric train a success". Media Statements. 20 November 1992. Retrieved 4 January 2024.
  42. ^ a b c d "Opening of Perth-Joondalup rail link". Media Statements. 20 December 1992. Retrieved 4 January 2024.
  43. ^ "Northern suburbs railway an instant hit". Media Statements. 21 December 1992. Retrieved 4 January 2024.
  44. ^ Hooker, Peter (21 December 1992). "Transperth tips rail boom". The West Australian. p. 4.
  45. ^ a b c d e "Bus/train interchanges on northern subs railway to open February". Media Statements. 28 January 1993. Retrieved 4 January 2024.
  46. ^ a b "Inspection of Joondalup train-bus interchange". Media Statements. 21 March 1993. Retrieved 4 January 2024.
  47. ^ a b c d Hooker, Peter (22 March 1993). "New rail line faces first big test". The West Australian. p. 22.
  48. ^ MetroBus (1998), MetroBus Annual Report 1997–1998, p. 64
  49. ^ Hooker, Peter (24 March 1993). "More delays as snarls hit new railway". The West Australian. p. 13.
  50. ^ "Opening of Currambine railway station next month". Media Statements. 17 July 1993. Retrieved 5 January 2024.
  51. ^ a b "New warning devices for Fastrak trains". Media Statements. 8 August 1993. Retrieved 5 January 2024.
  52. ^ a b c d "OnTrack: March 2003" (PDF). New MetroRail. p. 6. Archived from the original (PDF) on 29 August 2007.
  53. ^ "Minister to commence extension to the Northern Suburbs Transit System". Media Statements. 2 May 2001. Retrieved 18 May 2024.
  54. ^ "Bulk Earthworks". New MetroRail. Archived from the original on 29 August 2007.
  55. ^ "Contract Awarded for Burns Beach Road Rail Bridges". Media Statements. 11 July 2001. Retrieved 18 May 2024.
  56. ^ "Bridges". New MetroRail. Archived from the original on 29 August 2007.
  57. ^ "Railway and Track Infrastructure". New MetroRail. Archived from the original on 28 August 2007.
  58. ^ "$8.7million contract awarded for construction of Clarkson Station". Media Statements. 13 November 2002. Retrieved 18 May 2024.
  59. ^ "Work to start on Greenwood station". Media Statements. 12 February 2004. Retrieved 18 May 2024.
  60. ^ "Greenwood Station Construction". New MetroRail. Archived from the original on 29 August 2007.
  61. ^ "What's going on with Greenwood Station?" (PDF). New MetroRail. April 2004. Archived from the original (PDF) on 15 June 2005.
  62. ^ "OnTrack: Issue 5" (PDF). New MetroRail. April 2004. p. 4. Archived from the original (PDF) on 29 August 2007.
  63. ^ "First railcars arrive at new Nowergup train depot". Media Statements. 13 June 2004. Retrieved 18 May 2024.
  64. ^ "Currambine". New MetroRail. Archived from the original on 8 February 2006.
  65. ^ "Free rail travel to celebrate network expansion". Media Statements. 30 September 2004. Retrieved 18 May 2024.
  66. ^ a b "Gallop Government delivers northern rail extension on time and budget". Media Statements. 4 October 2004. Retrieved 18 May 2024.
  67. ^ a b "Services commence from Greenwood Railway Station". Media Statements. 29 January 2005. Retrieved 18 May 2024.
  68. ^ "City section of New MetroRail Project signed". Media Statements. 14 February 2004. Retrieved 18 May 2024.
  69. ^ "City tunnel project completion announced". Media Statements. 8 September 2007. Retrieved 18 May 2024.
  70. ^ a b Longhurst 2008, p. XVII.
  71. ^ "Perth's new underground railway stations ready for action". Media Statements. 14 October 2007. Retrieved 18 May 2024.
  72. ^ a b c "Perth CBD's first underground train station in operation". ABC News. 15 October 2007. Retrieved 18 May 2024.
  73. ^ "All aboard as the new Perth-to-Mandurah Railway begins". Media Statements. 23 December 2007. Retrieved 18 May 2024.
  74. ^ "Trains start using new Butler extension". Media Statements. 30 August 2014. Retrieved 18 May 2024.
  75. ^ a b "Barnett opens rail extension as first train leaves Butler station". WAtoday. 21 September 2014. Retrieved 6 January 2024.
  76. ^ "Butler train station and rail extension opens". ABC News. 21 September 2014. Retrieved 6 January 2024.
  77. ^ "Extended northern railway: Butler train station open today". PerthNow. 21 September 2014. Retrieved 6 January 2024.
  78. ^ Caporn, Dylan (8 February 2017). "Trains to Yanchep by 2021 with $386m Labor plan". The West Australian. Retrieved 24 March 2024.
  79. ^ "METRONET well underway with major funding injection". Media Statements. 7 September 2017. Retrieved 24 March 2024.
  80. ^ "Western Australia budget backs rail growth". Railway Gazette International. 13 September 2017. Retrieved 24 March 2024.
  81. ^ Caporn, Dylan (8 September 2017). "Budget 2017: Metronet construction to start in 2019". The West Australian. Retrieved 24 March 2024.
  82. ^ "METRONET progress on track". Media Statements. 21 August 2017. Retrieved 24 March 2024.
  83. ^ "Project Evaluation Summary METRONET: Yanchep Rail Extension" (PDF). Infrastructure Australia. 18 November 2018. Retrieved 24 March 2024.
  84. ^ "METRONET projects get Infrastructure Australia tick of approval". Media Statements. 16 November 2018. Retrieved 24 March 2024.
  85. ^ Wright, Shane (16 November 2018). "National infrastructure tsar gives green light to Perth Metronet plan". The West Australian. Retrieved 24 March 2024.
  86. ^ "Federal Funding Secured". Metronet. 15 November 2018. Retrieved 24 March 2024.
  87. ^ Jarvis, Lucy (16 November 2018). "Yanchep: Infrastructure Australia approves $700m federal contribution to Metronet rail projects". PerthNow. North Coast Times. Retrieved 24 March 2024.
  88. ^ "METRONET Bill to enshrine rail commitment in legislation". Media Statements. 10 May 2018. Retrieved 24 March 2024.
  89. ^ "Metronet legislation to pave way for construction of Yanchep rail extension". PerthNow. North Coast Times. 1 June 2018. Retrieved 24 March 2024.
  90. ^ "METRONET Rail Enabling Bill Passed". Metronet. 16 November 2018. Retrieved 10 September 2023.
  91. ^ "Two METRONET projects on track to begin construction next year". Media Statements. 3 July 2018. Retrieved 24 March 2024.
  92. ^ "Joint media statement – Wanted: Contractor to build Perth's new METRONET rail lines". Media Statements. 9 September 2018. Archived from the original on 19 July 2023. Retrieved 19 July 2023.
  93. ^ Gameng, Monica (10 September 2018). "Request for Proposal released for two major METRONET projects WA". Felix Vendor Marketplace. Archived from the original on 19 July 2023. Retrieved 19 July 2023.
  94. ^ Milne, Peter (6 April 2019). "METROconnex, NEWest Alliance consortiums vie for $1.1b Metronet's Thornlie-Cockburn and Yanchep rail work". The West Australian. Archived from the original on 6 April 2019. Retrieved 19 July 2023.
  95. ^ Beyer, Mark (8 April 2019). "Two bidders for rail projects". Business News. Archived from the original on 19 July 2023. Retrieved 19 July 2023.
  96. ^ "METRONET's Thornlie-Cockburn Link and Yanchep Rail Extension tender reaches next phase". Media Statements. 6 April 2019. Archived from the original on 19 July 2023. Retrieved 19 July 2023.
  97. ^ Zimmerman, Josh (24 November 2019). "NEWest Alliance appointed to deliver Yanchep rail extension and Thornlie-Cockburn link". The West Australian. Archived from the original on 19 July 2023. Retrieved 19 July 2023.
  98. ^ "NEWest Alliance chosen for Yanchep Rail Extension". Railway Technology. 26 November 2019. Archived from the original on 19 July 2023. Retrieved 19 July 2023.
  99. ^ Gameng, Monica (24 November 2019). "CPB-Downer JV selected as preferred contractor for METRONET projects". Felix Vendor Marketplace. Retrieved 24 March 2024.
  100. ^ Gubana, Benjamin (17 December 2019). "Metronet Thornlie-Cockburn link between Armadale and Mandurah train lines delayed to 2023 after $200m blowout". ABC News. Archived from the original on 19 July 2023. Retrieved 19 July 2023.
  101. ^ Smith, Ben (18 December 2019). "Major Metronet project over budget and delayed". PerthNow. Cockburn Gazette. Archived from the original on 19 July 2023. Retrieved 19 July 2023.
  102. ^ "WA Government signs contracts with NEWest Alliance". Railway Technology. 17 December 2019. Archived from the original on 14 May 2023. Retrieved 19 July 2023.
  103. ^ a b "Joint media statement - Work starts on METRONET Yanchep Rail Extension unlocking thousands of local jobs". Media Statements. 24 November 2019. Retrieved 24 March 2024.
  104. ^ "Eight months of milestones for Yanchep Rail Extension". Metronet. 17 December 2020. Retrieved 24 March 2024.
  105. ^ "Yanchep Rail Extension taking shape". Metronet. 21 May 2021. Retrieved 24 March 2024.
  106. ^ Jarvis, Lucy (17 June 2021). "Stalled: Yanchep Rail Extension work veering off track". PerthNow. Wanneroo Times. Retrieved 24 March 2024.
  107. ^ Jarvis, Lucy (22 July 2021). "Yanchep rail timetable shift flagged amid skills shortage". PerthNow. Wanneroo Times. Retrieved 24 March 2024.
  108. ^ "Projects adjusted to deliver a strong economy for the long term". Media Statements. 9 September 2021. Retrieved 24 March 2024.
  109. ^ de Kruijff, Peter (9 September 2021). "State projects delayed to ease pressure on 'hot' WA construction market". WAtoday. Retrieved 24 March 2024.
  110. ^ Clarke, Jenna (9 September 2021). "Metronet projects, including Thornlie-Cockburn link and Yanchep train line, will be DELAYED by 12-months". PerthNow. Retrieved 24 March 2024.
  111. ^ Brown, Tyler (10 September 2021). "Plans for principal shared path from Butler to Yanchep as part of rail extension scrapped to save money". PerthNow. Retrieved 24 March 2024.
  112. ^ Brown, Tyler (25 November 2021). "Wanneroo Council calls for cycle path to return as part of new Alkimos train station". PerthNow. Retrieved 24 March 2024.
  113. ^ "Concerns about Yanchep rail cost cutting as cycle path deleted". Yanchep News Online. 8 September 2021. Retrieved 24 March 2024.
  114. ^ Brown, Tyler (16 December 2021). "Metronet: Yanchep rail extension hits milestone with work underway at Alkimos, Eglinton and Yanchep stations". PerthNow. Retrieved 24 March 2024.
  115. ^ "All stations go for Perth's northern corridor". Metronet. 16 December 2021. Retrieved 24 March 2024.
  116. ^ de Kruijff, Peter (12 May 2022). "Record $33.9b for infrastructure projects as Premier plays down construction costs". WAtoday. Retrieved 24 March 2024.
  117. ^ Zimmerman, Josh (23 May 2023). "Budget Estimates: Premier Mark McGowan refuses to rule out more blowouts to Metronet costs". The West Australian. Retrieved 24 March 2024.
  118. ^ Hastie, Hamish (11 May 2023). "McGowan hammers cost-of-living as WA to hit $4.2b budget surplus". WAtoday. Retrieved 24 March 2024.
  119. ^ "2023–24 Budget: Economic and Fiscal Outlook" (PDF). Parliament of Western Australia. May 2023. p. 186. ISSN 1448-2630. Retrieved 4 October 2023.
  120. ^ Zimmerman, Josh (9 May 2024). "WA State Budget 2024: Treasurer Rita Saffioti announces WA's sixth surplus in a row, Metronet blowout". The West Australian. Retrieved 9 May 2024.
  121. ^ "WA Budget live: Unpacking what's in Roger Cook and Rita Saffioti's budget for 2024-25". ABC News. 9 May 2024. Retrieved 9 May 2024.
  122. ^ "2024-25 Budget Statements. Budget Paper No. 2 - Volume 2" (PDF). Our Budget. p. 619. Retrieved 9 May 2024.
  123. ^ Gameng, Monica (3 April 2022). "2022-23 Federal Budget: $2.1bn funding for WA infrastructure projects". Felix Vendor Marketplace. Retrieved 24 March 2024.
  124. ^ "CEO Newsletter - Federal Budget Update 2022". Infrastructure Australia. 31 March 2022. Retrieved 24 March 2024.
  125. ^ "State Budget delivers continued METRONET investment". Metronet. 11 May 2023. Retrieved 24 March 2024.
  126. ^ "Joint media statement - First track laid for METRONET Yanchep Rail Extension". Media Statements. 16 May 2023. Retrieved 24 March 2024.
  127. ^ Tan, Christopher (21 May 2023). "Metronet: Yanchep rail extension project crawls ahead after first 3km of track laid". The West Australian. Retrieved 24 March 2024.
  128. ^ Dietsch, Jake (22 December 2023). "First test run for $1.08b Metronet Yanchep rail extension marks major milestone after years of delays". The West Australian. Retrieved 24 March 2024.
  129. ^ Vieira, Isabel (22 December 2023). "Test train hits tracks on Yanchep extension". Business News. Retrieved 24 March 2024.
  130. ^ "Joint media statement - First test train on track at Yanchep". Media Statements. 22 December 2023. Retrieved 24 March 2024.
  131. ^ a b c d Dietsch, Jake (23 April 2024). "Metronet project: July opening date announced from Butler to Yanchep railway extension". The West Australian. Retrieved 23 April 2024.
  132. ^ "WA Australian Sports Centre Trust to take over ownership of the Arena Joondalup". Media Statements. 14 November 1996. Retrieved 6 January 2024.
  133. ^ "Structure Plan For Arena Joondalup Precinct" (PDF). City of Joondalup. p. 12. Retrieved 6 January 2024.
  134. ^ Northern Suburbs Transit System Master Plan 1989b, p. 14.
  135. ^ a b "Manual – Rail Access" (PDF). Public Transport Authority. Retrieved 12 July 2024.
  136. ^ "High Capacity Signalling Fact Sheet" (PDF). Metronet. p. 2. Archived (PDF) from the original on 30 March 2023. Retrieved 18 July 2023.
  137. ^ "METRONET: High Capacity Signalling". Infrastructure Australia. Archived from the original on 5 July 2023. Retrieved 18 July 2023.
  138. ^ a b "HCS SWTR Book 1 – Scope of Works DRAFT 01-09-21_Redacted". Tenders WA. 30 September 2021. pp. 77, 79. Archived from the original on 20 January 2022. Retrieved 20 January 2022. Click Download Now, then Download for Information Only. Make sure HCS SWTR Book 1 – Scope of Works DRAFT 01-09-21_Redacted.pdf is selected, then click Download Documents.
  139. ^ a b c "Joondalup Line Train Timetable" (PDF). Transperth. 20 November 2023. Retrieved 12 July 2024.
  140. ^ "Stations & Maps". Transperth. Retrieved 12 July 2024.
  141. ^ "Manual – Rail Access" (PDF). Public Transport Authority. 30 August 2021. p. 10. Archived (PDF) from the original on 21 September 2021. Retrieved 21 September 2021.
  142. ^ a b "Transperth Zone Map" (PDF). Transperth. Retrieved 18 May 2024.
  143. ^ a b "Railcar contract seals railway commitment". Media Statements. 12 May 2002. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  144. ^ a b "WA Railcar Program Project Definition Plan" (PDF). Metronet. December 2018. Archived (PDF) from the original on 18 January 2022. Retrieved 18 January 2022.
  145. ^ a b "Timetables change as train capacity boosted". Media Statements. 4 June 2009. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  146. ^ a b Zimmerman, Josh (19 March 2024). "C-series Metronet train due to enter service next month". The West Australian. Retrieved 19 March 2024.
  147. ^ a b "All aboard! First METRONET C-series train ready for passengers". Media Statements. 19 March 2024. Retrieved 19 March 2024.
  148. ^ "WA Railcar Program". Metronet. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  149. ^ "More trains for Perth's transport system". Media Statements. 19 September 2006. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  150. ^ "WA Government secures new railcars". Media Statements. 22 September 2006. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  151. ^ a b Carter, Mark (6 November 2013). "Perth grapples with growth and funding challenges". International Railway Journal. Archived from the original on 28 September 2020. Retrieved 18 January 2022.
  152. ^ "State Budget 2011-12: Supporting our Community; Building the State (Transport) - Massive injection to build WA's road, rail and bus networks". Media Statements. 19 May 2011. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  153. ^ "State Budget 2011-12: Building the State - Funding for new railcars for Perth's growing transport system". Media Statements. 23 May 2011. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  154. ^ a b "More rail cars for Perth transport system". Media Statements. 4 November 2012. Archived from the original on 19 January 2022. Retrieved 18 January 2022.
  155. ^ "Historic contract signed for WA-made METRONET railcars". Media Statements. 10 December 2019. Archived from the original on 20 January 2022. Retrieved 20 January 2022.
  156. ^ "Joondalup Line celebrates 30 years of train services". Media Statements. 20 December 2022. Retrieved 5 January 2024.
  157. ^ "Transport performance". Public Transport Authority. Retrieved 5 January 2024.

Sources[edit]

External links[edit]